MSP Airport Terminal 2 North Gate Expansion

MSP Airport supports or facilitates the employment of 93,350 people across several different industries and contributes $21.3 billion in economic output for Minnesota. MSP is the 17th busiest U.S. airport for passengers and 21st for aircraft operations.
The MSP Terminal 2 North Expansion project will add 168,000 sq. ft. on the north end of Terminal 2.
ECSI performed fiber optic cabling, fire alarm install, and Cat6 data drops in the new space as well as adjacent areas affected by construction. Coordination with Hunt Electric was key as they handled all conduit installation and box rough-in.

What's New Here?

  • Two new gates: H15 & H16
  • Re-spacing of gates H13 & H14
  • New concessions & restrooms
  • New loading dock & facility storage areas
  • Additional airline/tenant support spaces
  • Mechanical, electrical, & HVAC infrastructure replacements
  • Rainwater reclamation
  • Geothermal heat pumps
  • LED lighting
  • Building automation system monitoring
  • Expansion of green roof
  • Solar panel system