Skip to Main Content
Menu Close
Lakeville, MN

Hennepin County Youth Stabilization Center

PROJECT OVERVIEW
This new facility provides a long-term, secure, and rehabilitative environment for youth in need of behavioral and mental health support.  
Hunt Electric delivered design-assist electrical construction and ECSI System Integrators provided a complete low voltage cabling system in support of the fire alarm, security, automatic doors, and network cabling for Wi-Fi. 

UNIQUE ELEMENTS
Wherever possible, anti-ligature and anti-vandalism devices were incorporated into the design to create a secure environment prioritizing youth wellbeing.
Anti-ligature considerations: Special covers were installed over fire alarm notification devices and smoke detectors to protect youth safety.
Anti-vandalism devices: Anti-vandal card readers were deployed throughout the facility to ensure system integrity and longevity.
Innovative integration of electrical and low-voltage systems in a highly secure, healthcare-focused environment.

SERVICES PERFORMED:

  • Fire Alarm Monitoring 
  • Security Systems
  • Structured Cabling & Wi-Fi Solutions 
  • Automatic Doors & Operators
  • Design-Assist Electrical Construction by Hunt Electric

CHALLENGES & SOLUTIONS:

  • Aggressive Schedule:  The project schedule was very tight, which required detailed planning and coordination between all the trades.
  • Multiple Tenants: The Youth Stabilization Center added a new tenant to the building. This required working with multiple Hennepin County vendors to coordinate IT and security services to provide seamless functionality between the two tenants’ systems.
  • Design Changes:  Flexibility of the ECSI team enabled us to quickly adapt to changes in the design or provide additional services that required immediate attention.